1.       How different team members organize test cases (unit, system and integration testing)?
2.       How can I manage code whenever concurrent development and realize need to be perform?
3.       How can a developer incorporation bug solution in a specific realize?
4.       What is the status to release at the end of the month?
5.       How much implementation has been accomplished on the requirements in this release?
6.       How are our testers doing in authoring and executing their test cases?
7.       What was the changed in last night’s build?
8.       Why did this set of files change in this recent check - in? Was it used to implement a requirement or fix a bug?
9.       Which requirements are getting good test coverage versus requirements that are largely untested?
10.   How different teams communicate and share development information with each other?
A developer may not feel that he has detail information to develop or a designer can feel in a
Way at time of designing.
11.   How it is possible to identify time required for Compilation, Testing, Packaging, and deployment?
12.   Is manual work (copying to staging and production environments) hamper the Testing, Packaging, and deployment?
13.   How can I manage the test plans and determine progress of test execution during the release cycle?